Equipment area

Inspection and technical assessment of custom lifting equipment

For self-made, modified or non-standard lifting equipment, we start by clarifying intended use, capacity and technical records before defining the next assessment step.

Need inspection of special equipment and technical clarification? Approved S1 Enterprise of Competence • Type C
Call us

Custom lifting equipment – inspection and technical assessment

Overview of the main groups, typical inspection scope and relevant inspection basis for this equipment area.

SP-01

SP-01 – Self-made equipment

Equipment covered: self-made equipment

In-house manufactured lifting equipment may have incomplete technical records. Intended use, manufacturer responsibility and the verification basis must be clarified before inspection.

Typical inspection points for self-made equipment

  • Determine the applicable certified inspection category and scope.
  • Identify load path, rated capacity and essential safety functions.
  • Assess whether drawings and calculations provide a sufficient basis for inspection.
  • Determine whether design review or testing is needed.

SP-01 – Documentation before inspection of self-made equipment

  • Design drawings, calculations and intended-use description.
  • Material, welding and assembly records where relevant.
  • Marking, rated capacity, instructions and available conformity documentation.
  • Information on testing and previous use, if any.
SP-02

SP-02 – Modified or changed equipment

Equipment covered: modified or changed equipment

After modification, the original design must be compared with the actual change. Effects on rated capacity, load path and safety functions are clarified before further inspection.

Typical inspection points for modified or changed equipment

  • Identify which components and functions have been changed.
  • Assess effects on load path, capacity and stability.
  • Check updated marking, safety functions and relevant workmanship.
  • Determine whether design verification or extraordinary inspection is needed.

SP-02 – Documentation before inspection of modified or changed equipment

  • Before/after drawings and modification description.
  • Updated calculations, capacities and risk assessment where relevant.
  • Repair, material and weld-inspection records where applicable.
  • Previous reports, instructions and updated conformity basis.
SP-03

SP-03 – Technical clarification before inspection

Equipment covered: technical clarification before inspection

Technical clarification is used when inspection type, equipment category or technical documentation is unclear. The outcome defines what must be established before a conclusion is possible.

Typical inspection points for technical clarification before inspection

  • Identify equipment type, intended use and expected load.
  • Clarify missing identification, documentation or inspection history.
  • Assess whether calculations or design review are needed.
  • Define necessary inspection, testing or supplementary records.

SP-03 – Documentation before inspection of technical clarification before inspection

  • Photos of the equipment, marking, attachment and load pickup.
  • Available drawings, instructions and technical information.
  • Actual use, loading and modifications.
  • Previous reports, faults or incidents causing uncertainty.