Service

Follow-up inspection and close-out of lifting equipment findings

We verify corrective actions against findings in an earlier inspection report. The result shows which items can be closed and which still require action.

Need help with follow-up inspection and close-out of lifting equipment findings? Approved S1 Enterprise of Competence • Type C
Call us
Overview

What is follow-up inspection after competent inspection?

The previous report and evidence of completed work define the starting point. Follow-up inspection normally addresses specific findings; major repairs or changes may also require extraordinary inspection.

When is follow-up inspection needed?

Follow-up inspection is used when an earlier report identifies specific findings requiring verification after repair, adjustment, replacement or updated records.

The inspection is normally limited to the findings in question, but we also assess whether completed actions may have affected other safety-related conditions. If the action concerns major repair, modification or conditions that affect load-bearing capacity, stability or safety function, the case may also trigger extraordinary inspection under the Regulations concerning the Performance of Work section 13-2.

Follow-up of nonconformities, restrictions and observations

Findings should be described so the customer understands severity, consequence and required follow-up. Nonconformities require corrective actions, restrictions may allow conditional continued use, observations should be followed up, and comments document relevant information.

We reference each original finding and record the verification method and outcome. Unresolved items remain open.

Verification of corrective actions

  • whether the action was completed as described
  • whether documentation, marking or report basis is updated
  • whether function and safe use are restored
  • whether status can be closed or must remain open

Evidence of corrective actions supplied by the customer

For efficient follow-up inspection, the customer should send the previous report, photos, description of completed actions, repair documentation and any updated documentation before inspection.

Close-out of findings and updated inspection status

The updated report states which findings are closed, any remaining restrictions and the assumptions that apply.