How often must cranes and lifting equipment be inspected in Norway?

For cranes and lifting accessories covered by section 13-1 of the Norwegian Regulations concerning the Performance of Work, the main rule is competent inspection every 12 months. The calendar alone is not enough: environmental conditions, events and a new installation may require earlier inspection.

Published: 2026-11-05 Updated: 2026-11-06 Lesign Kontroll

Is annual crane inspection required by law in Norway?

The 12-month requirement comes from section 13-2. For equipment within its scope, this is a statutory main rule, rather than simply an industry recommendation. The employer must arrange inspection by an Enterprise of Competence (sakkyndig virksomhet) certified for the equipment concerned.

Lifting equipment is a broad everyday term. Before setting an interval, identify the actual equipment category and applicable rules. Equipment for lifting suspended loads and lifting accessories are listed in section 13-1. This does not mean that every product capable of lifting something falls under the same inspection scheme.

Examples relevant to this article include overhead travelling cranes, jib cranes, hoists and accessories such as slings, chain assemblies and shackles. Classification depends on function, design and use. Tail lifts, for example, require a separate assessment of their inspection arrangements. This article addresses Norwegian requirements within the Norwegian Labour Inspection Authority’s jurisdiction.

How often must an overhead crane be inspected?

Overhead travelling cranes covered by section 13-1 of the Norwegian Performance of Work Regulations normally require competent inspection every 12 months. Demanding conditions may call for more frequent inspection.

How often must slings, shackles and lifting accessories be inspected?

Lifting accessories covered by section 13-1 are normally subject to the same 12-month requirement. Pre-use checks and maintenance are additional obligations.

Relevant links

What is the difference between periodic, initial and extraordinary inspection?

Inspection situations and their triggers
Situation When does it apply? Basis
Periodic competent inspection Recurring inspection; the main rule is every 12 months. Section 13-2
Inspection after exceptional circumstances, often called extraordinary inspection Including significant overload, major repairs or modifications and hazardous restart after inactivity. Section 13-2 and relevant commentary
Inspection following installation or erection, often called initial inspection Before first use and after installation at a new location where safety depends on installation; exceptions apply. Section 13-3

A recent periodic inspection does not approve later damage or changes. If an overhead crane is moved to a new runway, the need for installation inspection must be assessed even when its annual inspection is still in date.

Relevant links

Can the 12-month inspection interval be extended?

Section 13-2 requires more frequent competent inspection where the environment makes it necessary. Salt, moisture, chemicals, dust and temperature can affect corrosion, mechanisms and safety functions. Manufacturer instructions, use, condition and previous findings must inform the follow-up plan.

A shorter interval may be needed to control risk. Maintenance and internal checks may also be necessary between competent inspections. Describe these activities separately so that a service agreement is not mistaken for competent inspection.

Section 13-2, second paragraph, permits a longer interval where it is documented that this will not endanger life or health and the competent inspector considers it fully justifiable. Infrequent use or indoor storage alone does not authorise postponement. Any extension needs a specific, documented assessment; the employer cannot decide it unilaterally.

Unsure about inspection type or the next due date? S1 Enterprise of Competence • type C • within approved scope
Call us

When is extraordinary crane inspection required?

Significant overload triggers competent inspection. Suspected overload or damage requires measures to prevent unsafe use and assessment of the event. An intact appearance or a current inspection sticker does not settle whether continued use is safe.

Major repairs and modifications are also listed in section 13-2. The Labour Inspection Authority’s commentary concerns work with substantial significance for safety and describes an exception for major repairs performed in accordance with the manufacturer’s instructions. A modification constituting a substantial change under the Machinery Regulations must instead address the manufacturer obligations for a new machine. Agree the inspection basis before work starts.

After equipment has been out of use for the preceding six months, competent inspection is required if restarting it could endanger life or health. Inactivity alone is not the complete condition. Storage environment, maintenance and condition matter to the assessment.

When is the next crane inspection due?

Record equipment identification, inspection history, the due date and the responsible person in your maintenance or internal control system. Book early enough to address findings as well as complete the inspection. A booking is not a completed inspection.

The Labour Inspection Authority’s commentary allows periodic inspection up to two months before the due date while retaining the original due month. Earlier inspection changes the starting point for the next ordinary inspection. A late inspection does not automatically move the original due month forward.

For example, equipment due in November can normally be inspected in September or October while retaining November as its due month. This is a planning provision, not permission to extend a deadline. Do not assume an undocumented grace period after expiry.

What happens if a crane inspection is overdue?

If a required inspection has not been completed by its due date, the employer must arrange competent inspection and prevent unsafe use. An older inspection report does not automatically extend the deadline.

Who is responsible for lifting equipment inspections?

Competent inspection does not replace pre-use checks, maintenance or training. A user’s check of a hook, latch, wire rope or sling may identify damage that occurred after the last competent inspection. Defects must be addressed when discovered.

Section 13-4 requires inspection records to be kept accessible to the authorities and the Enterprise of Competence, to accompany equipment when ownership changes, and inspection routines to form part of the internal control system. A sticker alone does not show the inspection basis, findings or restrictions.

Prepare instructions, equipment identification, previous reports and details of maintenance, damage and changes. Follow up the report with corrective actions and any necessary follow-up inspection.

Before requesting an inspection

  • Which cranes and accessories are involved, and where are they located?
  • When was the last documented inspection, and when is the next one due?
  • Are there open findings, events, modifications or extended periods of inactivity?
  • Is the equipment accessible, and can functional testing be arranged safely?

Clarify the right inspection and next due date

Lesign Kontroll provides inspection and technical assessment services for G3, G4, G5, G7, G8, G10, G20 and R1–R6. We are approved as an S1 Enterprise of Competence, independence type C, within our certified scope.

Send an equipment list, location and the latest inspection report, including details of changes or incidents. We can then clarify the inspection type, documentation needed and scope before you book.

Relevant links

Regulatory basis and sources

References to the relevant regulations are listed below. The information was reviewed on 05.11.2026. We update the article as needed and record subsequent changes.

Relevant links

FAQ

Frequently asked questions

Is servicing the same as competent inspection?

No. Servicing and maintenance have separate purposes. Competent inspection under chapter 13 must be performed and documented by an Enterprise of Competence certified for the equipment concerned.

Can rarely used equipment be inspected every two years?

Not automatically. An extension under section 13-2 needs documentation that life or health will not be endangered and a fully justifiable assessment by the competent inspector.

Does the six-month inactivity provision apply before the annual deadline?

Yes, where equipment has not been used for the preceding six months and restarting it could endanger life or health. This condition applies independently of the ordinary annual deadline.