When is initial crane inspection required in Norway?
Section 13-3 of the Norwegian Regulations concerning the Performance of Work applies where safety depends on installation or erection. The employer must arrange competent inspection before first use and after each installation or erection at a new location. Its purpose is to establish that equipment is correctly installed or erected and functions correctly.
Initial inspection and installation inspection are commonly used terms for these situations. Identify the actual trigger. Purchasing equipment or changing ownership does not itself amount to a new installation, and not every new lifting accessory automatically requires inspection under section 13-3.
New lifting accessories still need appropriate identification, documentation and safe follow-up. The scope of section 13-1 and inspection timing under section 13-2 must be assessed separately. This article explains Norwegian requirements within the Labour Inspection Authority’s jurisdiction.
Which cranes and lifting appliances need initial inspection?
| Situation | What needs clarification? |
|---|---|
| A new overhead crane installed in a workshop | Suspension, runway, attachments, function and documentation for the completed installation. |
| A used jib crane moved to another building | New attachments and supporting structure, capacity and erection at the new location. |
| A hoist installed on a new hoist track | The interaction between hoist, suspension and track; a current hoist sticker does not necessarily cover the new installation. |
| A crane exceeding 2 tonne-metres mounted on a vehicle | Section 13-3 specifically mentions this mounting situation. Clarify installation, stability and documentation. |
| New loose lifting accessories supplied complete by the manufacturer | Not automatically installation inspection under section 13-3. Clarify documents, receipt checks and subsequent competent inspection. |
Initial inspection of overhead travelling cranes
When an overhead crane is mounted on a runway, the completed installation requires inspection before use where safety depends on installation. The runway, attachments, functions and documentation are relevant.
Initial inspection of jib cranes
For a newly installed jib crane, checks include its foundation or wall mounting, supporting structure and load assumptions.
Initial inspection of hoists and monorails
A hoist installed on a new beam or runway must be assessed together with its supporting installation where safety depends on how it is mounted.
Initial inspection of truck-mounted cranes
Special inspection provisions apply when a crane with a rated lifting moment exceeding 2 tonne-metres is fitted to a vehicle. Mounting, stability and documentation are key considerations.
Does a CE-marked crane require initial inspection?
CE marking and the declaration of conformity concern the manufacturer’s responsibility for the machine. They do not, on their own, establish that every subsequent installation at the user’s site is correct. A CE-marked crane installed by someone other than the manufacturer or its representative may therefore need competent inspection before use.
The Labour Inspection Authority’s commentary explains an important exception: where the manufacturer has inspected the equipment on site after installation and before first use, a separate competent inspection before use is not required. A representative may perform this check with written authorisation. The Norwegian Labour Inspection Authority’s guidance on inspection scope refers to Annex I, section 4.1.3 of the Norwegian Machinery Regulations.
Do not confuse this with a factory test, delivery note or routine service. Establish what was checked on site, by whom and against which basis. Clarify the arrangement in the supply contract and before commissioning. This exception does not remove subsequent periodic competent inspection requirements.
Does a crane need inspection when it is moved?
New installation or erection at a new location is covered where safety depends on that work. This also applies to used equipment. An earlier report provides useful history but does not establish the safety of a new foundation or attachment.
The Labour Inspection Authority’s commentary excepts equipment specifically designed for easy dismantling for transport between workplaces and/or changes of erection in accordance with manufacturer specifications from a new competent inspection. Assess the exception against the actual design and instructions; it does not apply to every crane relocation.
Even where a new competent inspection is not required, erection, ground conditions, capacity and safe use still need to be addressed. Follow manufacturer requirements and company procedures. Changes or damage require separate assessment.
What documents are needed for initial crane inspection?
The inspection needs sufficient information about the equipment and its installation. Missing evidence for foundations or attachments cannot be resolved simply by checking whether a crane lifts a load. Involve the Enterprise of Competence early if the basis is unclear.
For used equipment, previous inspection reports and maintenance records are useful. If important documentation is missing, we may need additional information or checks before completing the inspection.
Prepare these before inspection
- Manufacturer, model, serial number, year and capacity markings.
- Operating and installation instructions and relevant conformity documents.
- Drawings and evidence for foundations, runway, suspension and attachments.
- Relevant diagrams, calculations, configuration details and operating limitations.
- Previous inspection reports, maintenance records and documented repairs or changes.
- Basis for functional tests and any test loads, with a safe execution plan.
Send request
Tell us what you need
Send the key details. We normally respond within one business day.
What is checked during initial crane inspection?
Section 8-7 of the Regulations concerning Administrative Arrangements covers safety-relevant parts, functional testing with a suitable load, protective devices and necessary instructions. Inspection after installation or erection must also consider the completed installation. The scope follows the design and inspection basis.
Functional testing with a suitable load is not a universal requirement for one fixed overload test on every type of equipment. Testing, load level and method must be established from manufacturer instructions, relevant standards and competent assessment. Do not use an arbitrary percentage or test load without a verified basis.
The result must be documented. Section 13-4 addresses storage and accessibility of records and their transfer when ownership changes. Restrictions and necessary actions must be understood and followed before the equipment is used.
When is the next inspection required after commissioning?
Initial inspection is not lifetime approval. The employer must plan maintenance, pre-use checks and periodic competent inspection. For equipment within section 13-1, the main rule in section 13-2 is inspection every 12 months.
Significant overload and other exceptional circumstances may require earlier inspection. Repairs and modifications need assessment of their safety significance and the relevant exceptions in the Labour Inspection Authority’s commentary. A substantial change under the Machinery Regulations creates manufacturer obligations that an ordinary inspection report cannot replace.
Clarify inspection before installation and commissioning
Lesign Kontroll provides inspection and technical assessment services for G3, G4, G5, G7, G8, G10, G20 and R1–R6. We are approved as an S1 Enterprise of Competence, independence type C, within our certified scope.
Send the equipment type, location, planned commissioning date and documents for installation and supporting structure. Explain who will install and inspect the supplied equipment. We can help clarify the inspection type, necessary basis and next steps.
Regulatory basis and sources
References to the relevant regulations are listed below. The information was reviewed on 05.11.2026. We update the article as needed and record subsequent changes.
FAQ
Frequently asked questions
Does every new lifting accessory need initial inspection under section 13-3?
No, not automatically. Section 13-3 concerns safety dependent on installation or erection. Documentation and inspection requirements under sections 13-1 and 13-2 still need to be addressed.
Is a current annual report enough when an overhead crane is installed in a different building?
The report does not replace assessment of the new installation. Where safety depends on installation or erection, section 13-3 and any applicable exceptions must be considered before use.
Can the manufacturer inspect equipment before first use?
Yes. The Labour Inspection Authority describes an exception from a separate competent inspection when the manufacturer has inspected on site after installation and before first use. A representative needs written authorisation. Confirm the scope and documentation.