Initial inspection before equipment is put into service
Initial inspection is used when new or used lifting equipment is put into service for the first time, when equipment is installed or assembled at a new location, or when the previous inspection basis is not sufficient. The requirement is particularly linked to the Regulations concerning the Performance of Work section 13-3 when safety depends on installation or assembly, and to section 13-1 when the equipment is work equipment for lifting suspended loads or lifting accessories.
We review available documentation and compare it with actual execution, marking, configuration, capacity and intended use. When needed, involvement level, verification scope, functional verification and testing are defined.
The result is documented in a report/certificate in line with the Regulations concerning the Performance of Work section 13-4. When the basis is sufficient and the inspection is satisfactory, initial inspection may support issue of a certificate or statement for the equipment.
Initial inspection: documentation, marking and conformity
- agreement between documentation, marking and actual equipment
- declaration, instructions, certificates, drawings and test basis
- whether equipment is installed, configured and marked for intended use
- whether design review, functional test or load test is needed